HENGDA JIANGHAI's "Flood Control Weapon" Helps Ningbo Zhenhai District Qingshuipu Pump Station Project Successfully Pass Completion Acceptance


On December 26, 2023, after three years of intensive construction, the Qingshuipu pumping station project in Zhenhai District, Ningbo City, Zhejiang Province passed the completion acceptance smoothly, and the quality of the project reached an excellent level. Another "water control device" was added to the Yongjiang River. This marks the transition of Qingshuipu pumping station from construction stage to management and operation stage, and the flood control and drainage capacity of Zhenhai area has reached a new level, marking a significant contribution to the construction of the "Five Horizontals and Four Verticals" flood control and drainage system in Zhenhai!

The total investment of this project is 189.21 million yuan, and it has been included in the "14th Five Year Plan" for the integrated development of the Yangtze River Delta. It is an important project that effectively alleviates the drainage pressure on the plain on the Hainan side of the town. This project adopts five 2200mm submersible axial flow pumps produced and manufactured by Hefei HENGDA JIANGHAI Pump Co., Ltd. The single unit design flow rate of this project is 15 cubic meters/second, and the total flow rate of the pump station is 75 cubic meters/second. It is currently the largest vertical submersible axial flow pump group with single unit design flow rate in China. The completion acceptance of this project marks the successful application of HENGDA JIANGHAI's independently developed new product - the vertical submersible axial flow pump with the highest single flow rate.

The vertical submersible axial flow pump set with the largest single unit design flow rate in China

This project has won honors such as the 2021 Zhejiang Province Water Conservancy Civilization Standardization Construction Site and the 2022 Municipal Water Conservancy Science and Technology Innovation Award.

In the future, it will stand tall on the Yongjiang River and contribute its efforts to the flood control and drainage of Zhenhai. At that time, the flow rate of the offshore drainage gate in Zhenhai District will reach 1133.8 cubic meters per second, and the strong drainage capacity of the pumping station will reach 385 cubic meters per second, effectively alleviating the "pain points" of urban waterlogging in the Zhenhai Zhuang area of Ningbo, and maximizing the benefits of the Zhenhai East Drainage South Line project. HENGDA JIANGHAI will strengthen the research and development of key core technologies, and strive to help build a high-quality and benchmark project for the Qingshuipu pumping station, enhance the flood control and drainage capacity of the Zhenhai Plain, and improve the regional water ecological environment!


COPYRIGHT © 2024 HENGDA JIANGHAI  |  Label  Powered by www.300.cn