-
Language
Zambia project
Time:
Jul 31,2024
Hengda Jianghai has once again demonstrated its strong technical strength and innovation ability in the drainage and remineralization project of the copper mine of Zambia's Luanshya Mine. The well depth of the project reaches 1,200 meters, and the total drainage capacity is as high as 170 million cubic meters, equivalent to the water storage capacity of 13 West Lakes in Hangzhou, which is a major breakthrough in mining engineering.
With excellent technological innovation and outstanding engineering practice, Hengda Jianghai, through the combined use of intelligent technologies such as intelligent submersible pumps and five-in-one intelligent control devices. It effectively improves the drainage efficiency, ensures the safety and stability of the drainage system, and further consolidates the company's leading position in the industry.

Previous
Next
Contact us
Tel: +86 551 6520 5211
Fax: +86 551 6545 4610
Postcode: 231131
Email: sales@hdjhpump.com
Address: No, 2 Xifeihe Road, Shuangfeng Industrial Zone, Hefel City, Anhui Province, China.
COPYRIGHT © 2024 HENGDA JIANGHAI | Label Powered by www.300.cn